Centrale elettrica solare Banwell

Dati geografici
LuogoNorth Sommerset, Banwell, UK
Coordinate geografiche51°19’ N, 2°51’ W
Irradiazione annua globale1,057 kWh/m²/yr
Media annuale temperatura9.9 °C, 50 °F
Precipitazioni annuali867 mm/yr, 34.13 in/yr
Dati tecnici
Data connessione alla reteMarch 2015
Potenza installata7,149.52 kWp
Tipo moduliSF170-S
Quantità di moduli42,056
Inclinazione, orientamento15°, 0° (S)
Produzione stimata1,080 kWh/kWp/yr
CO2 risparmiata654 kg/yr, 1.442 lbs/yr
InverterSchneider PVbox
Banca finanziatrice
-

Excellent performance under challenging conditions
High-performing CIS Solar Power Plant in Banwell sets tone for upcoming solar power plants in the UK.

Extremely short construction period

The construction of the ground-mounted 7.15 MW power plant in Banwell (Somerset County, England) was very short, started under tough winter conditions and taking place only between mid-January and mid-March 2015. Despite the challenging conditions and tight schedule, successful grid connection was completed on March 19th, 2015.

Perfect match: UK weather conditions and
Solar Frontier CIS modules

Along with the rest of South West England, Banwell has a temperate climate. However, convective cloud sometimes forms, reducing the number of hours of sunshine. Annual sunshine rates are slightly less than the regional average of 1,600 hours. Average rainfall is around 867 mm (34.13 in). This is precisely where the advantages of Solar Frontier CIS technology come in. Thanks to their high shadow tolerance and their favorable low-light performance the CIS PowerModules are achieving higher yields than other module technology. A performance ratio of more than 90% was achieved continuously at a very early stage since the beginning of operations. The project is expected to generate around 7.7 GWh of electricity a year. The power generated from the power plant is enough to supply electricity to approximately 1,900 homes.

Sustainable in every way

Furthermore Solar Frontier PowerModules comply with the stringent requirements of the RoHS (Restriction of Hazardous Substances), an increasingly important criterion for investors in reference to renewable energy. Eliminating cadmium and lead: no environmentally hazardous materials are processed by Solar Frontier.

The key to success: high quality
components and reliable partners

The success of this project was also a result of the quality of the components, excellent teamwork on the part of all players, and early involvement of all stakeholders. New Energy for the World (NEW) acted as developer and EPC and demonstrated best practice in a teamoriented development approach. Value-oriented investors appreciate the high quality of all components, the outstanding performance and the Solar Frontier guarantee package. As a result, very high interest among investors was generated for the purchase of the Banwell project. After just a short time in operation, the Banwell power plant was transferred in May 2015 to an institutional investor.