Centrale elettrica solare Lechena

Dati geografici
LuogoLechena, Ilias, Grecia
Coordinate geografiche37,91° N, 21,23° E
Irradiazione annua globale1.650 kWh/m2
Media annuale temperatura17,5 °C
Precipitazioni annuali748 mm
Dati tecnici
Data connessione alla reteDicembre 2011
Potenza installata99.90 kWp
Tipo moduliSF150-L (150 W)
Quantità di moduli666
Inclinazione, orientamento25°, -1° sud
Produzione stimata192.000 kWh/anno
CO2 risparmiata135.000 kg/anno
Inverter6 x SMA Sunny Tripower 17.000 TL-10
Banca finanziatrice
Private Investment

 

 

Olympic Engineering & Consulting, owned by engineer Zois Sidirokastritis, is based in Pyrgos, Ilias, Greece. The company is one of the largest and most experienced in PV in Southern Greece. The main activities of the company are deployment and distribution of photovoltaic systems in both residential and commercial areas since 2008.

This almost 100 kWp solar power plant of Solar Frontier CIS thin-film modules was connected to the grid in Lechena, Ilias, Greece in December 2011. The 666 modules were installed with southern orientation and an optimal tilt angle of 25 degrees. In the first year of production the installation achieved an energy output of 192,000 kWh and thus offset about 135 tons of CO2 emissions. The generated output shows that production of this plant is up to 10% higher than of other solar power plants with poly or mono crystalline silicon modules installed in the same region.

The special challenges for this installation were the climate conditions of the Mediterranean region, which is mainly characterized by hot summer days and cool, rainy winters. The performance of the Solar Frontier modules excels in this region especially due to their high temperature stability, which means less output loss at high environmental temperatures. According to Olympic Engineering & Consulting during cloudy days the exceptional lowlight behavior of the panels leads the park to outperform all parks in the area by levels around 20 %, even those employing solar tracking systems. Only half a year later the high performance and the yields of this plant lead to the construction of a similar solar power plant with Solar Frontier CIS thin-film modules only 40 meters away from this one.